|
|
|||
|
||||
OverviewOver time, certain repair measures must be carried out on every structure. Many tunnels in Central Europe, and especially in Germany, are over 100 years old and are no longer fit for purpose. They no longer comply with current rules and regulations and must be adapted to meet current safety standards. There is therefore a great need for renovation here. These existing tunnels were built using different construction methods, such as the English, Austrian or German tunnel construction methods. These are decisive factors in choosing the appropriate renovation measures. The construction measures and methods used for tunnel refurbishment and renewal must be continuously adapted to the latest state of the art. In addition, companies must comply with both national regulations and the legal requirements of central authorities, such as the European Union. Full Product DetailsAuthor: Parisa ShabaniPublisher: Our Knowledge Publishing Imprint: Our Knowledge Publishing Dimensions: Width: 15.20cm , Height: 0.50cm , Length: 22.90cm Weight: 0.118kg ISBN: 9786209202179ISBN 10: 6209202179 Pages: 80 Publication Date: 30 October 2025 Audience: General/trade , General Format: Paperback Publisher's Status: Active Availability: Available To Order We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |
||||