|
|
|||
|
||||
OverviewThe Otago Central Railway or Otago Central Branch Railway (OCB), now often referred to as the Taieri Gorge Railway, was a secondary railway line in Central Otago, in the South Island of New Zealand. Construction of the OCB began in 1877 and the 27-km section to Hindon was opened in 1889. The line was completed to Middlemarch two years later. The line reached Cromwell, 236 km, in 1921. The Clyde - Cromwell section (20 km) was closed in 1980 due to construction of the Clyde Dam, a hydro-electric power station in the Cromwell Gorge on the Clutha River. Full Product DetailsAuthor: Erwin Dee KordPublisher: Solv Imprint: Solv Dimensions: Width: 15.20cm , Height: 0.60cm , Length: 22.90cm Weight: 0.163kg ISBN: 9786137847077ISBN 10: 6137847071 Pages: 104 Publication Date: 28 October 2011 Audience: General/trade , General Format: Paperback Publisher's Status: Unknown Availability: Not yet available This item is yet to be released. You can pre-order this item and we will dispatch it to you upon its release. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |