OverviewThe transition period between operation of an installation and the implementation of the decommissioning strategy is a critical one. In this period, a number of modifications, both technical and organizational, are needed to adjust a plant to meet new objectives and requirements. It is essential that detailed planning for decommissioning begin in good time during plant operation and that preparatory actions for the implementation of the decommissioning strategy be initiated immediately after permanent shutdown. This ensures a gradual transition and minimizes uncontrolled loss of resources. The purpose of this report is to highlight technical, management and organizational issues during the transition period, to provide guidance to minimize delays and undue costs, to optimize personnel and other resources, and to initiate preparatory activities for decommissioning in a planned, timely and cost-effective manner. Full Product DetailsAuthor: IAEAPublisher: IAEA Imprint: IAEA Dimensions: Width: 15.20cm , Height: 1.30cm , Length: 22.90cm Weight: 0.381kg ISBN: 9789201141033ISBN 10: 9201141033 Pages: 221 Publication Date: 30 June 2004 Audience: Professional and scholarly , Professional & Vocational Format: Paperback Publisher's Status: Active Availability: To order Stock availability from the supplier is unknown. We will order it for you and ship this item to you once it is received by us. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |