Final Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative, White Marsh, Maryland (DOE/EA-1723S)

Author:   National Energy Technology Laboratory ,  U S Department of Energy
Publisher:   Createspace Independent Publishing Platform
ISBN:  

9781482554304


Pages:   126
Publication Date:   15 February 2013
Format:   Paperback
Availability:   In stock   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $55.41 Quantity:  
Add to Cart

Share |

Final Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative, White Marsh, Maryland (DOE/EA-1723S)


Add your own review!

Overview

DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S. manufacturing facility to produce the first U.S.-manufactured electric motor components and assemble electric drive units for hybrid and electric vehicles. This funding would be used for constructing a building of approximately 104,000 square feet, paving an approximately 120,000 square foot parking lot, twenty-foot wide fire road representing approximately 8,000 square feet of pavement or gravel, and widening a truck dock as well as various other supporting infrastructure. DOE's proposed action would provide approximately $105 million in financial assistance in a cost-sharing arrangement to GM. The cost of the proposed project would be approximately $283.9 million. This EA evaluates the environmental resource areas DOE commonly addresses in its EAs and identifies no significant adverse environmental impacts for the proposed project. The proposed project could result in beneficial impacts to the nation's fuel efficiency and the local economy.

Full Product Details

Author:   National Energy Technology Laboratory ,  U S Department of Energy
Publisher:   Createspace Independent Publishing Platform
Imprint:   Createspace Independent Publishing Platform
Dimensions:   Width: 21.60cm , Height: 0.70cm , Length: 28.00cm
Weight:   0.308kg
ISBN:  

9781482554304


ISBN 10:   1482554305
Pages:   126
Publication Date:   15 February 2013
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   In stock   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

lgn

al

Shopping Cart
Your cart is empty
Shopping cart
Mailing List